1. We permit a maximum of 80% load at 0.8 PF under normal working condition.
  2. The generator supplied is of 415 volts, 50 Hz, 3 phase with 0.8 power factor.
  3. In case power factor defers, the load drawn will also be deferred corresponding to power factor.
  4. It must always be remembered that overloading & sudden jerk loads are the main cause for the breakdown of any DG Set.
  5. The sudden block loading should not cross more than 50% of the DG load capacity.

'